This project involved a major refurbishment of a four star hotel in the Lake District. The challenge Willian UK undertook was to complete works on two restaurants (170 covers), two bars and three function/conference rooms within eight weeks whilst causing minimum disruption to allow the hotel to continue trading. This was achieved by detailed project management to successfully phase the works, including coordinating all subcontractors and client direct suppliers.
The finished product is a modern contemporary look using specialist glass, bespoke joinery and innovative lighting.
Completed corridor leading to 14 bedrooms. Following the flood all walls from one metre above floor level and associated joinery and M & E points had to be renewed. New bespoke doors and frames were also supplied by Willian UK to suit clients required taste.
Stunning feature fireplace that wows guests as they enter the reception area. The stone was sourced locally and hand picked by one of the areas most sought after stone masons.
New look snug. Brand new flooring which was transformed pror to installation to look distressed by our specialist floor laying team.
Bespoke artwork on the entrance to the new Scullery.
Refurbishing the bar area.
Patio area completely re-flagged.
Typical en-suite bathroom, new tiling, sanitary and flooring.
Corridor leading to bedrooms, replasterd and decorated.
Rear walkway with newly laid Indian stone flags.
Reception in the pool area. New counter, backfitting, flooring and decor.
The coffee station with bespoke units and granite worktops mixed together with hand-made wall tiles to create a truly stunning effect.
The pub area with feature fire places, which had to be replaced.
Installation of new kitchen cookline equipment.
Reception in restaurant.
The reception in the restaurant was fitted out with bespoke units made in our joinery shop. As this is the lowest part of the hotel, again it was under three feet of water, and as you can see the lower half feature stair case was destroyed. As this picture shows the new and existing are a perfect match.
The kitchen, which was under three feet of water, was completely destroyed. Willian UK decided to install a completely new, low maintenance, highly hygienic kitchen for our client, with a new floor which incorporated aco drainage system for daily wash down. The walls were finished with a fire rated whiterock washdown board.
The new bar, which with input from the client and our design team, made to look as if it was there when the hotel was a coach house many many years ago.
Gents toilet which went through a complete refit of wall finishes, sanitary ware and bespoke joinery items.