The Swan Story
This project involved a major refurbishment of the four star Swan Hotel in the Lake District. The challenge Willian UK undertook was to complete works on two restaurants (170 covers), two bars and three function/conference rooms within sixteen weeks as the hotel had to cease trading - so the goal was to get the hotel re-opened as soon as possible. This was achieved by detailed project management to successfully phase the works,
including coordinating all subcontractors and client direct suppliers. The finished product is a modern contemporary look using specialist glass, bespoke joinery and innovative lighting.
This text will be replaced
Discover The Swan Story
-
The Flood - What Happened?
In 2009, after particularly heavy rains, the grey-blue waters that now look so calm, took on a sinister life of their own, swelling above the shores to flood The Swan Hotel and Spa. Positioned right on the shore of the lake, it was hit particularly badly by the Cumbria floods, its 16th century skeleton and designer interior suddenly awash with muddy water...
Discover More
-
Back On Track - The Refurb
The Swan has just undergone an imaginative modernisation, expertly carried out by Willian UK. The interior construction work was to the highest standards. Bespoke doors and frames, stunning locally sourced stone fireplaces, specialist wooden flooring and all bedpoke joinery and that's not all...
Discover More
-
Calm After The Storm - The End
The all new Swan Hotel was finished to an exceptionally high standard by Willian UK. Forget coach prints, expect Chesterfield sofas with Union Jack cushions, turquoise armchairs, log burning stoves and old school trunks with table lamps on...
Discover More
contact us
Discover more about Willian UK